|
|
HISTORY 1970 : Shiraz Refinery with daily capacity of 40,000 BPSD (2 million metric ton/ year ) was designed by U.O.P and constructed by SNAM projecti, Italian company under supervision of N.I.O.C .The crude oil supplied to the refinery from GACH- SARAN by means of a 10 diameter pipeline, 230 km distance.1973 : The refinery was started up by Iranian engineers and experts.1982: Installation of the new industrial water treatment equipment.1984: Design and construction of Asphalt Blowing Unit.1994: Erection of a new crude heater for revamp of atmospheric tower.
|